| T-2 (09/14-04/15) | T-1 (10/15-11/15) | T0 (11/15-05/16) | T1 (05/16-06/16) | T1 (10/16-11/16) | T1 (04/17-05/17) | Tx (05/17-12/17) | Tx (01/19-06/19) |
---|---|---|---|---|---|---|---|---|
 | Baseline | Dissemination workshop | Study preparation | Goal setting workshop | Support workshop 1 | Support workshop 2 | Post intervention | Long-term follow-up |
Assessment of primary and secondary study outcomes (all facilities participating in TREC) | Â | Â | Â | Â | Â | Â | Â | Â |
 TREC survey | X |  |  |  |  |  | X | X |
 RAI-MDS 2.0 | X |  |  |  |  |  | X | X |
 Unit profile survey | X |  |  |  |  |  | X | X |
 Facility profile survey | X |  |  |  |  |  | X | X |
Enrolment (all TREC facilities in Alberta and British Columbia) | Â | Â | Â | Â | Â | Â | Â | Â |
 Ethics/operational approvals |  |  | X |  |  |  |  |  |
 Eligibility screening |  |  | X |  |  |  |  |  |
 Randomization/allocation |  |  | X |  |  |  |  |  |
 Recruitment and informed consent (BAF/EAF) |  |  | X |  |  |  |  |  |
Study intervention | Â | Â | Â | Â | Â | Â | Â | Â |
 Standard Feedback (SF) |  | X |  |  |  |  |  |  |
 Basic Assisted Feedback (BAF) |  | X |  | X | X (virtual) | X (virtual) |  |  |
 Enhanced Assisted Feedback (EAF) |  | X |  | X | X (face-to-face) | X (face-to-face) |  |  |
 Ongoing phone/e-mail support (EAF) |  |  |  | ––––––– | ––––––– | ––––––– |  |  |
Process evaluation | Â | Â | Â | Â | Â | Â | Â | Â |
 Workshop evaluation surveys (at the end of each workshop) |  | X |  | X | X | X |  |  |
 Workshop fidelity checklist and debriefs (at the end of each workshop) |  | X |  | X | X | X |  |  |
 Detailed documentation of workshops (participant observations) |  |  |  |  | X (during workshops) |  |  |  |
 Focus groups with BAF/EAF unit managers |  |  |  |  |  | X (05/2017) |  | X (12/2018) |
 Semi-structured interviews with SF unit managers |  |  |  |  | X (01/2017) |  |  |  |
 Basic cost evaluation of the intervention |  |  |  | ––––––– | ––––––– | ––––––– |  |  |