Fig. 5

Projected patient recruitment with 95 % credible interval for the Robot study at each month: the red line indicates the proposed sample size n = 158 and the blue line is final recruitment n = 126
Projected patient recruitment with 95 % credible interval for the Robot study at each month: the red line indicates the proposed sample size n = 158 and the blue line is final recruitment n = 126